Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt

News Hub

Riyadh Office Open

News Hub

mac pushing MMC to support robust construction market in Saudi Arabia

News Hub

mac-group enters Saudi Arabia

News Hub

The most challenging fit out mac has ever worked on – our own!

Archives

Project-Images-_0015_SMBC-14

SMBC Aviation Capital

SMBC Aviation Capital   Project Overview Fit out works over 2 floors and 3 phases. Open plan office space, cellular office space, executive board rooms. New canteen includes full feature walls and ceiling installation.

Read More
Oracle-Block-B-BIM-LEED

Oracle – Block B

Oracle Block B – Phase 1 – Base Build & Fit Out   With the completion of Block B, mac achieved our first ever LEED Platinum Certification, the highest certification a project can achieve. This project included a full Cat…

Read More
Bitmap - 41

Irish Life – Hambleden House

Irish Life, Hambleden House Complete refurbishment of the existing ground floor reception area including demolition of existing fixtures, fittings and finishes, new floor wall and ceiling finishes.

Read More
Bitmap - 14

BT – Belfast

BT Belfast Riverside Tower Redevelopment Our ongoing relationship with BT has to date yielded a 3 phase redevelopment of 3 different locations totalling 115,000 sq ft. BT Belfast Riverside Tower offices spanning over 50,000 sq. ft. Works included: New carpets…

Read More
Bitmap - 19

Diageo

Diageo Capital House Belfast CAT B CAT B refurbishment for drink giants Diageo. The project was located on the 3rd floor in Capital House, Belfast. This project was carried out over a fast-track 7 week programme. The project works included:…

Read More
Bitmap - 12

Broadcom

Broadcom Office fit out Interior office fit out of the first floor for the new EMEA Broadcom Centre of Excellence in Block W, Eastpoint Business Park, Dublin 3. Broadcom’s new offices were completed on time, to budget and to a…

Read More
Brown-Brothers-Harriman-LEED

Brown Brothers Harriman

Brown Brothers Harriman   mac completed four fit out projects at two locations for BBH at Herber Street, Dublin over a seven year period. Including their move to their newly fitted out three floor headquarters. This project achieved a LEED Gold…

Read More
Jacobs 2118_001D-1

Jacobs

The project involved the full strip out and fit out of the ground floor, movement of staff from temporary first floor space to newly fitted space before carrying out the same procedure for the second floor.

Read More
Bitmap - 38-2

IBM – Corporate HQ

IBM – Corporate HQ CAT A and CAT B fit out on IBM Corporate Dublin HQ Refurbishment project, on the Shelbourne Road. The project entailed the complete strip out and fit out of 3 floors within an occupied building. The…

Read More
Project-Images-_0003_XL-Group362

XL Catlin

XL Catlin, Dublin   Project Overview mac fully re-purposed this Georgian building. 25,000 sq. ft. of 21st century office. Preserving all listed period features. Fully covert M&E Installation We get so many great compliments from visitors to our office –…

Read More
Bitmap - 18

Chartered Land

Chartered Land Grand Canal CAT A Reinstatement CAT A landlord reinstatement across 3 floors for Chartered Land at number 2 Grand Canal Square, Dublin 2.  All of the works undertaken during this project was in a fully occupied building. The…

Read More
Project-Images-_0005_UTV-Ireland344

UTV Ireland

UTV Ireland have joined FM104 and Q102 in their new custom-designed Macken House HQ. MCA designed a stylish, functional, creative space. This project was completed by our Dublin team. #TEAMmac mac-group worked perfectly with our in-house team…every step of the way…

Read More