With the completion of Block B, mac achieved our first ever LEED Platinum Certification, the highest certification a project can achieve. This project included a full Cat A and Cat B refurbishment. This included an installation of a new structural steel and balustrades for a staircase. Installation of new raised access floor throughout the project.
mac has been contracted by Oracle to renovate and upgrade multiple blocks in the Eastpoint campus for the company’s growing employee base in Dublin. Works have included structural enhancements, façade replacements, plant strip out and full mechanical & electrical installations. A new restaurant, gym and exercise facilities with state of the art audio visual and meeting space. Smart buildings with intelligent BMS with two buildings achieving LEED Platinum accreditations.
Oracle EastPoint Business Park, Dublin – Read about Phase 2 Block C and Phase 3 Block A.
This project achieved LEED Platinum rating.
Size: | 60,000 sq. ft. |
Duration: | 28 weeks |
Team: | Meehan Associates Hardy Partnership JV Tierney |