fbpx
Search
Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt
Search in comments
Filter by Custom Post Type

Change to CDM Regulations

23.06.2014

CDM Regulations-body_63

CDM Regulations 2015 – Are you ready?

The HSE’s consultation to replace the current CDM Regulations include significant changes anticipated to go live from April 2015.

The proposed key changes are:

  • Removal of the CDM Co-ordinator role.
  • Introduction of the Principal Designer role to control the pre-construction phase.
  • Construction Phase Plan must be prepared for all projects.
  • Increased Client liabilities including production of F10 notification and pre-construction information.
  • No transition period for the change in regulations.
  • Domestic projects are no longer exempt from the regulations.
    For more info email dublin@mac-interiors.com

Do you have a project you'd like to talk to us about?

Get in Touch