Search
Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt
Search in comments
Filter by Custom Post Type

Change to CDM Regulations

23.06.2014

Share with a friend
CDM Regulations-body_63

CDM Regulations 2015 – Are you ready?

The HSE’s consultation to replace the current CDM Regulations include significant changes anticipated to go live from April 2015.

The proposed key changes are:

  • Removal of the CDM Co-ordinator role.
  • Introduction of the Principal Designer role to control the pre-construction phase.
  • Construction Phase Plan must be prepared for all projects.
  • Increased Client liabilities including production of F10 notification and pre-construction information.
  • No transition period for the change in regulations.
  • Domestic projects are no longer exempt from the regulations.
    For more info email dublin@mac-interiors.com

Do you have a project you'd like to talk to us about?

Get in Touch