Trident House – Full Landlord Refurbishment 

 

Project Overview

A full landlord refurbishment of Trident House. All floors have open-plan floorplates while the double-height reception area and lobby were redeveloped to have a contemporary feel.

 

Project Works

  • The new spec included raised access floors
  • Exposed ceilings with acoustic treatment to the slab
  • Automatic lighting control system
  • Air conditioning
  • Two eight-person lifts and toilet/shower facilities

Façade works to the building were also undertaken including window replacement.

 

This project was completed by our Dublin team #TEAMmac

 

Project Details

Size: 20,000 sq. ft.
Duration: 19 weeks