Quantum Unit 3 is part of a development of 4 no. warehouses and comprises 178,000 sq. ft. of warehousing and office spaces. The development also includes the repositioning of the site access to the north of the site to provide a new entrance. A second vehicular access was provided to the south-west. Road upgrade works were completed which included the partial upgrade of Kilshane Cross signalised junction to incorporate a left turning lane and upgraded signals. New cycle paths and pedestrian footpaths were also provided. This project is aiming to achieve LEED Gold and BREEAM Excellent certification.
Siteworks include internal roadways; pedestrian access; 150 No. ancillary car parking spaces, 20 No. bicycle parking; 20 No. loading docks, 4 No. grade access doors and associated yard; level access goods doors; hard and soft landscaping; boundary treatments; ESB substations; signage; PV panels; lighting and associated site development works above and below ground. The total gross floor area of the development is 54,763 sq m (including warehouse structures, gate house and ESB substations).
The warehouse is designed as a single compartment, open plan arrangement. This allows for maximum flexibility in racking arrangements and work flow. The ancillary open plan office and main staff facilities, are offset from the main building. A marshalling office with ancillary staff facilities are centrally located to the loading bay areas. HGV / Marshalling Yard Traffic is purposefully separated from the Staff / Visitor parking areas.
General services & small power, lighting and emergency lighting and control systems, communications & IT services, access control, fire alarm installation, security installations, PV roof panels and lift installations.
Site services installation including rainwater harvesting system, soils & wastes, mains water and gas services. Building installations including hot & colder water storage, domestic hot water generation, space heating & cooling (VRF system), ventilation & heat recovery units, fire & smoke dampers and a BMS.
The incorporation of Sustainable Energy Technologies beyond NZEB requirements and application of LEED Gold and BREEAM Excellent Standards.
Further Information:
Size: | 178,000 sq. ft. |
Duration: | 48 Weeks |
Team: | Quantity Surveyor: KSN Architect: The O'Toole Partnership Services Consultant: Metec Consulting Engineers Civil Engineer: O'Connor Sutton Cronin Structural Engineer: Complete Design Partnership Assigned Certifier: Garland Consulting |