Significant alterations and refurbishments for our Client Hibernia Reit on both One Dockland Central and Two Dockland Central
This involved the strip out of 3 floors within the building back to ‘grey box’ and major upgrades to the landlord areas. All the works were undertaken within a live situation whereby existing tenants continued to operate as normal. Following completion of the works for Hibernia Reit we also carried out a CAT B fit out for Hubspot on two floors.
The works consisted of carrying out a complete strip out of all finishes back to ‘grey box’ for 6 floors of this building. In addition, we carried out major structural alterations to the entrance area creating a double height space and replaced all lift cars. Complete new M&E installation was completed to the landlord areas with major upgrades to lift lobbies and toilets and the installation of a feature staircase within the atrium. As with One Dockland Central all these works were completed whilst tenants continued to operate within the building.
Size: | 218,250 sq. ft. |
Duration: | 81 weeks |
Team: | Gardiner & Theobald HLW Architects Scollard Doyle RKD Architects Cogent Ethos |