Project Overview

Design and Build London project for the Entertainment Centre

Project Works 

  • Including over-cladding of the front entrance
  • Forming new entrance steps and ramps, enclosing second floor terrace area
  • Re-roofing of both towers and refurbishment and opening up of the mall area inclusive of all necessary associated works
  • Maintaining the operations of a live multi-tenanted entertainment centre has been a key challenge to this project which the team have mitigated through the phasing of works to ensure that pedestrian flow is consistently maintained

This project was completed by our London team. #TEAMmac

Project Details

Size: 143,242 sq. ft.
Duration: 30 weeks
Team: Tridant Building Consultancy