Jet.com

CAT B office fit out of Ground, 3rd, 4th & 5th floor

Construction of plasterboard and glazed partitions, plasterboard bulkheads and suspended raft ceilings

Re-routing existing M&E services

Installation of new M&E and Data services

Specialist joinery package including wall panelling, pallet ceilings, 3 x tea stations, 1 x canteen with servery islands, shelving, seating and plywood clad wall

Acoustic insulation to ceilings and select printed fabric insulation to meeting room walls.

Graphics and manifestations package

Installation of acoustically rated Skyfold (vertically opening) and Espero (horizontally opening) walls on ground floor meeting space

Integrated lighting, AV and blinds system on ground floor

Installation of lockers

Floor finishes, decorations, blinds and timber doors and skirting throughout.

 

Key Challenges:

Phase 1 works included a 1 week fit-out of the 2nd floor including installing data services, electrical services, floor finishes and furniture to allow client to work from 2nd floor during the build.

Installation of Skyfold walls, supporting steel work and acoustic bulkhead over to create acoustic seal.

Project Details

Value:2.4m
Size:16,400 sq. ft.
Duration:16 weeks
Team:Colliers International