Crux Product Design
Full CAT A and CAT B fit out which provides Crux Product Design Limited with their new office headquarters in Bristol. mac worked closely with Crux to ensure that all of their future needs would be met by this project.
The base build development required a complete fit out which included:
Other works carried out over 4 floors included:
This project was completed by our Birmingham team #TEAMmac
Find out more about Crux here.
Size: | 10,000 sq. ft. |
Duration: | 16 weeks |