As a testament to our ability to deliver, satisfaction and dedication to our clients’ mac are once again engaging with Castleforge Partners on their latest project at One Cathedral Square situated in the heart of Bristol city centre.
This building is adjacent to the Marriott Royal Hotel and historic Bristol Cathedral in a very restricted area that required mac to develop a robust and site-specific logistics plan to ensure that our works were adequately serviced whilst protecting the safety of the public.
The accommodation extends to 55,000 sq. ft. over four floors while the building features large open floorplates surrounding a naturally lit central atrium. The CAT A project had a fast track 30-week construction programme.
This project was completed by our London team #TEAMmac
Size: | 65,000 sq. ft. |
Duration: | 30 weeks |
Team: | Gpad London Ltd. Ramboll Hoare Lea Linesight TFT |