Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt
Project

Bristol-Myers Squibb – Cruiserath

Bristol-Myers Squibb – Cruiserath

mac partnered with Jacobs Engineering to develop the pharmaceutical CAT B fit out of a new build structure for Bristol-Myers Squibb and their pharmaceutical facilities in Cruiserath. The project included the main labs, offices and canteen building as well as warehouse units. This project achieved a LEED Silver Rating.

Project Works:

  • Partitions
  • Ceilings
  • Soft, hard and resin flooring
  • Feature staircases
  • Architectural metalwork
  • Clean room laboratories
  • Bathrooms
  • Kitchens
  • Canteen area
  • Glazed partitions
  • Specialist joinery and decorations
  • Industrial plant area
  • Fit outs and renovation of existing structures

Additional information: 

This project was completed by our Dublin team #TEAMmac

Bristol-Myers Squibb has trusted mac with two of their pharmaceutical fit out projects in Cruiserath and Swords.

Bristol-Myers Squibb are a global biopharmaceutical company whose mission is to discover, develop, and deliver innovative medicines that help patients prevail over serious diseases.

Read more about LEED on our blog.

Project Details

Size: 290,000 sq. ft.
Duration: 56 weeks
Team: Jacobs Engineering

Do you have a project you'd like to talk to us about?

Get in Touch